Hummer H1 Build Progress

IMAG0108

First up in this section is the gearbox.

IMAG0109

The brake disc and pads are added to the gearbox.

The pin at the top will be attached to the throttle servo later which will apply the brakes when the throttle is released.

IMAG0111

The gearbox is added to the chassis connecting to the the front and rear drives.

I have also added the fuel tank which is simply held in with two screws.

These are not fully screwed in to make sure the fuel tank can rock slightly.

IMAG0295

The electronics box is now added. This houses the battery box, steering servo and throttle servo.

The steering servo is connected to the steering rod.

IMAG0298

Here you can see how the throttle servo also connects to the brake pin allowing it to both control the flow of fuel into the engine carb (when fitted) and the brakes.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s